A portion of the below grade sawmill support wall toward the stream side raceway had split apart, was undermined, and fallen away from its prior location.

Foundation Issues
&
Resolution

IMG_1802.jpg

An attempt to straighten the stream side wall resulted in a crack -- the wall needed to be replaced. Removing the road side wall required excavating the wall and creating a sloped surface for safety. The H & K Group provided the technology and material to create a new sawmill foundation.

_BDM5060.jpg
_BDM5063.jpg
_BDM5083.jpg
_BDM5088.jpg
_BDM5105.jpg
IMG_3136.jpg

Crushed stone was placed between the foundation footers for mill wall support and to prevent water pooling.

An H-beam found onsite was cut and modified to span the opening in the foundation and support the coming sawmill floor.

IMG_3138.jpg
IMG_3140.jpg

The tail race slopes were evened up and then seeded with grass and covered with straw.